Project Details

• Installation of 300mm2 XLPE cabling onto existing cable tray (Plant room)
• Installation of temporary 300mm2 XLPE cabling to temporary chiller (Crane lift into position)
• Installation of 630amp, 3phase isolation box
• Installation of 630amp, 3phase circuit breaker into existing mechanical distribution board
• De-energized & energized testing



Electrical Package Consists of:

• Electrical Emergency Breakdown
• Electrical Infrastructure
• Power Generation
• Crane Works