Project Details

Installation of 100kW Solar PV:
• 21 x Schools
• 100kW of Solar PV per site
• 3292 x Solar Panels
• 28 x 27.5kW Solar Edge inverters
• Solar Edge monitoring
• Solar analytics monitoring
• Education training package
• Ongoing maintenance
• LED upgrade of 1881 luminaires
• Creating an approximate total energy savings of 1,496,000 kWh per year
• Creating an approximate total financial saving of $485,000 per year
• Total Greenhouse Gas Emissions (Co2) reduction of 911,000 kgs per year



Electrical Package Consists of:

• Electrical Infrastructure
• Electrical Preventative Testing
• Electrical Breakdown Maintenance
• Structural Engineering
• Solar PV
• Solar PV Design & Engineering
• Energy Monitoring
• Energy Management
• Structured Cabling
• Civil Works