Project Details

• Demolition of the existing cool rooms, beer garden & ground floor accommodation
• Installation of new LED lighting, electric booth heaters, circulating fans all controlled via C-BUS scene settings
• Installation of power throughout new Beer Garden & associated areas
• Installation of new air conditioning units & relocation of accommodation air conditioning units
• Installation of hi-speed structured cabling



Electrical Package Consists of:

• Electrical Lighting & Power
• Electrical Infrastructure
• LED Lighting Upgrade
• Area Lighting
• Electrical AS3003 Body Protected areas
• Electrical Preventative Testing
• Electrical Breakdown Maintenance
• Lighting Control / Automation
• Structured Cabling
• CCTV
• Security / Access Control
• Audio Visual
• MATV System
• Fire Detection
• Air Conditioning
• Civil Works