top of page

Adelaide Youth Training Centre Green Energy Carpark

Project Details
Client

Spotless Projects

Value

>$1m

Division

Sustainable Energy

Industry

Infrastructure

Completion date

July 2020

Mutlti award winning Sustainable Energy project, including the first car park solar PV installation at a correctional facility in Australia

Stage 1: Installation of 259kW Rooftop Solar PV:
• 719 x 360watt Jinko panels.
• 4 x SMA Core 1 inverters.
• AC Infrastructure upgrades
• Energy monitoring connectivity.
Stage 2: Installation of 201kW Carpark Solar PV:
• 464 x 435watt JA Solar panels • 4 x SMA Core 1 inverters.
• 2 x Electric Vehicle charging stations • AC Infrastructure
• Energy monitoring connectivity. Stage 3: Installation of 151kW Carpark Solar PV:
• 348 x 435watt JA Solar panels
• 2 x SMA Core 1 inverters.
• 6 x 15kW Tesla Powerwall 2 commercial batteries
• Energy monitoring connectivity. *Total site details
612kW of Solar PV
90kW of Commercial Battery Storage

Our services include:
• Full Design and Construct
• Consultation
• Cost Planning and Management
• Design and Engineering
• Procurement
• Project Management
• Certification
• Ongoing O&M maintenance

Delivery:
• Delivery of all site works as principal contractor
• Civil works
• Electrical infrastructure
• Electrical Lighting & Power
• Independent certification from specialist engineers (Electrical and Structural)
• Mechanical installation
• Rigging
• Crane activity works
• Traffic Control
• Solar PV installation
• AC Electrical infrastructure
• DC works
• Testing and commissioning
• Carpark Roof Structures
• Electric Vehicle Charging Stations
• Roof safety systems
• Area Lighting
• UPS
• Battery Storage (Ready)
• Energy Monitoring
• Energy Management
• Structured Cabling
• Electrical Emergency Breakdown
• Electrical Preventative Testing
• Electrical Breakdown Maintenance
• Project handover and user training
• O&M lifecycle maintenance

Project Gallery
bottom of page